Press

2025-02-04
WIMBY in Portugal to discuss the wind sector with the support of interactive tools
APREN received in Portugal the WIMBY (acronym for Wind In My BackYard), a European project funded by the Horizon Europe framework program.
2025-02-04
The fulfillment of the solar promise
Portugal presents a very ambitious strategic vision of development for solar photovoltaic, reflected in the National Energy and Climate Plan for 2030 (PNEC 2030).
2025-02-03
Solar energy in Portugal reaches new records
It could become the source with the most installed power as early as next year.
2025-01-26
"It is a huge civilizational setback not to realize that the world has to move forward with a renewable matrix."
Pedro Amaral Jorge comments to DN that the US president's intentions follow a "propagandistic logic". He is confident that reality will belie the will of the new administration of the White House.
2025-01-22
The world is producing more and more green electricity
In 2023, for the first time, more than 40% of all electricity produced in the world was generated from non-polluting sources.
2025-01-16
Agrovoltaics in the Iberian Peninsula: innovation for a sustainable future
On January 22, at 9:00 a.m. local time, the event "Agrovoltaics in the Iberian Peninsula: innovation for a sustainable future" will take place in Badajoz (Spain), organised by APREN and UNEF.
2025-01-16
Today in the News: Taxes, Renewables and Investment
Records in renewables are not enough to win the race with Spain in investment.
2025-01-13
APREN does not consider it too ambitious to install 2 GW offshore by 2030
For Pedro Amaral Jorge, it is "urgent" that Portugal leaves the tail of Europe in wind energy.
2025-01-11
Portugal at the tail of Europe in the installation of new wind energy in 2024
The country is making great strides in solar and between 2023 and 2024 installed 1,343 MW of new photovoltaic capacity. However, the same is not true in wind power.
2025-01-10
Working group has until May to submit proposal to tax IMI on dams and wind farms
The unit to evaluate the method for collecting the tax from renewable energy power plants comes with a delay of more than half a year compared to the promise of the Minister of Finance.