News

2025-10-30
Renewable Energies: A New Life for Geothermal Energy
As a prelude to the forthcoming regulatory framework, the Strategic Plan for Geothermal Energy was well received by academia and the market.
2025-10-30
The new invisible market of green electricity used in transportation
RED III is more than a European directive: it is an attempt to turn electrification into industrial policy, to assign a price and market to clean energy. Portugal has the experience, knowledge, and human capital to do it.
2025-10-30
Europe has its eyes on geothermal energy
With potential to be explored, geothermal energy is gaining prominence in the energy transition at the European level.
2025-10-30
Climate change affects the cost of housing
Banks are already incorporating the risks associated with climate change into mortgage lending. At the same time, properties with better energy certifications come out ahead.
2025-10-30
WindEurope warns that without port investment there can be no wind energy
Ports face new demands, needing more space, more robust infrastructures, and better logistics to keep up with the rapid growth of wind energy sources.
2025-10-29
EDA President says that the Azores market cannot accommodate competition
The president of EDA argued that the Azorean market is too small to accommodate private competition in energy distribution and production, warning that this would raise tariffs.
2025-10-29
Alliance for the Energy Transition promotes free training to prepare professionals
The training sessions will be free, open to the general public, and held in a hybrid format in November 2025 and January 2026.
2025-10-29
Too much sun, little network: Europe faces risk of blackouts due to electrical overload
According to European network managers, the speed at which solar energy has been installed exceeds the capacity of existing infrastructures.
2025-10-29
Six months later, Portugal speeds up response to a future blackout
Minister Maria da Graça Carvalho assures that Portugal is better prepared to face network failures.
2025-10-28
Cape Verde launches its first project financed by debt-forgiveness with Portugal
The contract titled 'Repowering of the Palmarejo Photovoltaic Plant' provides for a maximum capacity of 10 megawatts, equivalent to supplying energy to between 20,000 and 25,000 inhabitants.